Construction Updates
The Inn Town Campground crew has been hard at work through the hot days of August. In the last month, we’ve continued our infrastructure construction: building roads, cutting RV spots, installing sewer pipes, preparing the building pads and more.
As the campground takes shape, Dan has been looking for the perfect place to make a level tent pad in our various tent sites.
Much of the cross-country sewer pipe installation was completed with a directional boring machine. This allowed us to install the necessary piping without too much impact to the forest.
The sewer pipe was heat welded into 1000 foot sections before being pulled through the bore hole. This section curved around the campground like a giant snake.
Ken from S & P Excavating and his co-pilot Fred smile for one of the many pictures.
Dan looking at a recently graded back-in RV spot; this one with a raised picnic area at the rear.Erin & Dan sporting our Inn Town Campground t-shirts! We’d love to see yours if you’ve got one, feel free to tag us on Instagram #InnTownCampground or share it on our Facebook page or drop us an email.
Leave a Reply
Want to join the discussion?Feel free to contribute!